Mitigation bank operator

Eco Terra Partners LLC Mitigation Banks

Eco Terra Partners LLC is a mitigation and conservation bank operator with a portfolio of 5 banks across 2 states (Georgia, North Carolina). They break down as 1 approved, 4 withdrawn. 1 bank currently lists available credits. Its banks are regulated by the USACE Savannah and Wilmington districts. They sit in 5 counties, among them Durham, Lenoir and Macon. The portfolio includes Little Tennessee UMB - Lakey Creek Mitigation Site, Eco Terra Neuse 01 UMBI - Auctioneer Forest Mitigation Bank and Eco Terra Neuse 02 UMB - Memorial Mitigation Bank. 1 sale is recorded across these banks since September 2025.

Figures mirrored from USACE RIBITS · synced

banks
5
states
2
banks with credits
1
RIBITS 2026-09-11

Credits available across the portfolio

Wetland
1.751credits
Stream
1,492.00credits

Portfolio locations

Banks operated by Eco Terra Partners LLC

portfolio

5 banks

5 banks, 5 rows
Mitigation bankClassificationAvailableUnit5 yr. sales
Little Tennessee UMB - Lakey Creek Mitigation SiteApprovedStreamWetlandStream · Cold Water StreamWetland · Riparian, Non-Riverine1,492.00 — Stream · Cold Water Stream1.751 — Wetland · Riparian, Non-RiverineNorth Carolina Stream Quality Assessment Worksheet — Stream · Cold Water StreamRatio — Wetland · Riparian, Non-Riverinesales by year — 2021: 0, 2022: 0, 2023: 0, 2024: 0, 2025: 0, 2026 (partial year, through 2026-09-10): 11 sale
Eco Terra Neuse 01 UMBI - Auctioneer Forest Mitigation BankWithdrawnNo credit rows in the registrynot reportedno unit recordedno sales
Eco Terra Neuse 02 UMB - Memorial Mitigation BankWithdrawnNo credit rows in the registrynot reportedno unit recordedno sales
Eco Terra Upper Falls Lake UMB - Alder Valley SiteWithdrawnNo credit rows in the registrynot reportedno unit recordedno sales
Mill Creek Mitigation Site (GALT)WithdrawnILFNo credit rows in the registrynot reportedno unit recordedno sales

Recent credit sales at these banks

Withdrawals recorded in the RIBITS ledger — the credits these banks sold to offset permitted impacts. The buyer is not shown: ledger use here is deliberately restricted to the existence, quantity and date of a transaction.

ledger · withdrawals

1 sale

1 sale, 1 row
DateMitigation bankClassificationCredits
Date2026-01-06Little Tennessee UMB - Lakey Creek Mitigation SiteClassificationRiparian, Non-RiverineCredits0.06

About the data on this page

Bank details, status and credit balances are mirrored from the USACE RIBITS registry, the federal public record for mitigation banks. Credit classes offset different resources and are never added together. Totals across many banks are rounded to whole credits — a single bank’s own balance never is. What we call a “credit sale” is a credit withdrawal — the entry written in the federal credit ledger when credits are committed to a permit. At commercial banks a withdrawal generally represents a sale; at a single-client bank it offsets the sponsor’s own project. The figures count ledger transactions, not distinct purchases — one purchase may produce several withdrawals — and we count entries rather than credits moved, because credit classes are different units and cannot be added together. Each bar in a sales chart counts the credit sales recorded in that calendar year — withdrawals from the federal ledger, not quantities of credits. The final bar is the year in progress and is shown in a different color. No bars means no sales in those years.

The operator grouping is ours, not from RIBITS. The federal registry records a sponsor for each bank but lists no parent company. We identify operators by matching sponsor names and contact details across bank records, reviewed by hand. We only display operators with at least five banks.

“Recent sales” covers the last twelve months. A map of pins shows where banks and sites are, not where they can sell. Service areas are wider than the pin and are decided by the Corps — open a bank, or run a location search, to see the area it actually covers. The map on this page is drawn live from the EPA NEPAssist RIBITS MapServer when you load it.

How these figures are builtReport an issue